Violation Detail
Standard Cited: 19260754 A Structural steel assembly.
Inspection Nr: 1426381.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,048.00
Current Penalty: $4,048.00
Issuance Date: 02/24/2020
Nr Instances: 1
Nr Exposed: 7
Abatement Date:
Gravity: 10
Report ID: 0216000
Contest Date:
Final Order: 03/23/2020
Related Event Code (REC): A;R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 02/24/2020 | $4,048.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.754(a): Structural stability was not maintained at all times during the erection process: On or about: 8/27/2019 Location: 3rd floor level a) Structural stability was not maintained during the steel erection process as construction material loads and workers were placed on the 3rd floor prior to the C-joist ends being solidly built into masonry wall pockets, metal bridging not completed, and corrugated steel floor decking not secured to the "C-Joists" against unintended movement which exposed employees to a collapsing floor fall, struck-by and caught-in/between hazards.