Violation Detail
Standard Cited: 19100159 C10 Automatic sprinkler systems.
This violation item has been deleted.
Inspection Nr: 1409528.015
Citation: 01004
Citation Type: Serious
Abatement Date: 09/27/2019 2
Initial Penalty: $5,304.00
Current Penalty: $0.00
Issuance Date: 09/19/2019
Nr Instances: 1
Nr Exposed: 35
Related Event Code (REC):
Gravity: 5
Report ID: 0213600
Contest Date:
Final Order: 09/19/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/19/2019 | $0.00 | 09/27/2019 | Serious | |
Penalty | Z: Issued | 09/19/2019 | $5,304.00 | 09/27/2019 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.159(c)(10): The minimum vertical clearance of 18 inches between automatic sprinkler systems sprinklers and the material below was not maintained. a) Laundry Department - On or about 6/19/19, boxes of stored materials and supplies were stacked to within 10" of the automatic sprinkler heads. ABATEMENT CERTIFICATION REQUIRED