Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1406638.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,304.00
Current Penalty: $3,183.00
Issuance Date: 12/06/2019
Nr Instances: 3
Nr Exposed: 20
Abatement Date: 06/01/2020
Gravity: 5
Report ID: 0626700
Contest Date:
Final Order: 01/02/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/02/2020 | $3,183.00 | 06/01/2020 | Serious | |
Penalty | Z: Issued | 12/06/2019 | $5,304.00 | 01/27/2020 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment. (a) On or about June 10, 2019, at the Texmark Chemical facility located at 900 Clinton Dr. Galena Park, Texas, the employer did not develop and implement a written piping inspection procedure for PSM covered process piping.