Violation Detail
Standard Cited: 19100107 C06 Spray finishing using flammable and combustible materials.
Inspection Nr: 1405431.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,978.00
Current Penalty: $1,472.00
Issuance Date: 12/02/2019
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 12/30/2019
Gravity: 10
Report ID: 0524530
Contest Date: 12/18/2019
Final Order: 08/17/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/17/2020 | $1,472.00 | 12/30/2019 | Serious | |
Penalty | C: Contested | 12/20/2019 | $3,978.00 | 12/30/2019 | Serious | |
Penalty | Z: Issued | 12/02/2019 | $3,978.00 | 12/30/2019 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.107(c)(6): Electrical wiring and equipment not subject to deposits of combustible residues but located in a spraying area as herein defined were not explosion-proof type approved for Class I, group D locations and did not otherwise conform to the provisions of subpart S of this part, for Class I, Division 1, Hazardous Locations: Employer did not ensure electrical equipment located in the spray area was explosion proof when employees were spraying a paint mixtures that was a Category 1 flammable liquid with a flashpoint of fifty (50) degrees and: A. There was an open and exposed electrical outlet in the spray area. B. There was a three bulb light fixture that was missing one of the bulbs.