Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 1394834.015
Citation: 01004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $11,934.00
Current Penalty: $11,934.00
Issuance Date: 10/16/2019
Nr Instances: 3
Nr Exposed: 4
Abatement Date: 10/28/2019
Gravity:
Report ID: 0316100
Contest Date:
Final Order: 11/01/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/01/2019 | $11,934.00 | 10/28/2019 | Other | |
Penalty | Z: Issued | 10/16/2019 | $11,934.00 | 10/28/2019 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): a) Bag House - On or about April 16, 2019, a set of pulleys and a belt which was 66 inches above a stair landing was left unguarded. b) Bag House - On or about April 16, 2019, a set of pulleys and a belt which was 53 inches above a stair landing was left unguarded. c) Elevator - On or about April 16, 2019, a set of pulleys and a belt which was 12 inches above a stair landing was left unguarded. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.