Violation Detail
Standard Cited: 19100119 J04 I Process safety management of highly hazardous chemicals.
Inspection Nr: 1391907.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,260.00
Current Penalty: $5,304.00
Issuance Date: 08/16/2019
Nr Instances: 8
Nr Exposed: 3
Abatement Date: 09/20/2019
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 08/29/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/29/2019 | $5,304.00 | 09/20/2019 | Serious | |
| Penalty | Z: Issued | 08/16/2019 | $13,260.00 | 09/20/2019 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment. a) On or about 4/9/2019, in the DN-3 Process, the employer did not ensure that inspections were performed on the Terpinolene Feed Tank pressure vessel. c) On or about 4/9/2019, in the DN-3 Process, the employer did not ensure that inspections were performed on the pipe segment from the initiator to the reactor. h) On or about 2/21/2019, in the Building 9 Control Room, the employer did not ensure that inspections were performed on the ventilation system positive pressure unit.