Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1381588.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,956.00
Current Penalty: $3,978.00
Issuance Date: 04/25/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/30/2019
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 05/20/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/20/2019 | $3,978.00 | 06/30/2019 | Serious | |
Penalty | Z: Issued | 04/25/2019 | $7,956.00 | 05/15/2019 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.107(b)(5)(i): There were no visible gauge(s), audible alarm(s) or pressure activated device(s) installed on paint spray booth(s) to indicate or insure that the required air velocity was maintained: On or about February 28, 2019, the employer did not have the visible gauge on the spray booth to indicate the required air velocity.