Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1330241.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,641.00
Current Penalty: $6,984.60
Issuance Date: 10/09/2018
Nr Instances: 1
Nr Exposed: 25
Abatement Date: 11/27/2018
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 10/22/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/22/2018 | $6,984.60 | 11/27/2018 | Serious | |
Penalty | Z: Issued | 10/09/2018 | $11,641.00 | 11/27/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed. On 7/5/18, at the Acworth facility, the employer did not conduct a periodic inspection of the Lockout program procedures on an at least annual basis. Deficiencies include not all equipment has specific written procedures created (some equipment without procedures include: TP 11 Audit Booth, Fast Bond 7 Robot Cell, PU Presses 1-6). Also, no review of the already established equipment procedures have been made with designated Authorized employees.