Violation Detail
Standard Cited: 19100305 A04 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1325472.015
Citation: 01004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,239.00
Current Penalty: $500.00
Issuance Date: 11/06/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/19/2018
Gravity:
Report ID: 0112600
Contest Date: 11/28/2018
Final Order: 09/25/2019
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/25/2019 | $500.00 | 11/19/2018 | Other | |
Penalty | C: Contested | 12/03/2018 | $9,239.00 | 11/19/2018 | Serious | |
Penalty | Z: Issued | 11/06/2018 | $9,239.00 | 11/19/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.305(a)(4)(iii): In dry locations, where not exposed to severe physical damage, conductors separately enclosed in flexible nonmetallic tubing, were not in continuous lengths not exceeding 4.57m (15.0 ft.) and secured to the surface by straps at intervals not exceeding 1.37m ( 4.5ft.) : (a) Site: in the vicinity of the warm edge machine in the facility located at 5 Cudworth Road, Webster, MA 01570, on 9/7/2018 and at times earlier, the flexible nonmetallic tubing enclosing wiring to the warm edge machine (a wet process) was not in continuous length due to a break in the tubing which was exposing the electrical conductors contained within.