Violation Detail
Standard Cited: 19100147 F04 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1318978.015
Citation: 01004
Citation Type: Serious
Abatement Date: 07/25/2018 2
Initial Penalty: $6,467.00
Current Penalty: $4,500.00
Issuance Date: 07/17/2018
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0418600
Contest Date:
Final Order: 07/31/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/31/2018 | $4,500.00 | 07/25/2018 | Serious | |
Penalty | Z: Issued | 07/17/2018 | $6,467.00 | 07/25/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(f)(4): During shift or personnel changes, specific procedures were not utilized to ensure the continuity of lockout or tagout protection, including provision for the orderly transfer of lockout or tagout devices between off-going and oncoming: a) On or about May 23, 2018 and times prior shift change lockout/tagout procedures: The employer failed to ensure the continuity of the lockout/tagout procedure was maintained during shift change when there was no lock placed Mold machine B-2 between 3rd and 1st shift which had the cylinder removed.