Violation Detail
Standard Cited: 19260405 A02 II I Wiring methods, components, and equipment for general use.
Inspection Nr: 1310686.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,658.00
Current Penalty: $2,560.60
Issuance Date: 08/31/2018
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 5
Report ID: 0214500
Contest Date:
Final Order: 01/24/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/24/2019 | $2,560.60 | Serious | ||
Penalty | Z: Issued | 08/31/2018 | $3,658.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.405(a)(2)(ii)(I): Protection was not provided to avoid damage to flexible cords and cables used for temporary wiring which passed through doorways or other pinch points: a) Front Door: Employees were exposed to electric shock hazard from an extension cord that was not protected from being pinched by a doorway, on or about 4-23-18.