Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1309939.015
Citation: 01004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,239.00
Current Penalty: $9,239.00
Issuance Date: 10/10/2018
Nr Instances: 2
Nr Exposed: 13
Abatement Date: 11/28/2018
Gravity:
Report ID: 0626000
Contest Date: 11/01/2018
Final Order: 03/18/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/18/2019 | $9,239.00 | 11/28/2018 | Other | |
Penalty | C: Contested | 11/02/2018 | $9,239.00 | 11/28/2018 | Serious | |
Penalty | Z: Issued | 10/10/2018 | $9,239.00 | 11/28/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. On or about 04/17/2018, at CITGO Refinery West Plant located in Corpus Christi Texas, the employer did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy, including and not limited to the following: a. HCGO pump, 521-P-5C in Coker unit b. Feed pump 586-P-0062 near Coker unit