Violation Detail
Standard Cited: 19100269 D06 VI Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1305883.015
Citation: 01004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $6,929.00
Current Penalty: $6,929.00
Issuance Date: 07/31/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/06/2018
Gravity:
Report ID: 0420100
Contest Date: 08/24/2018
Final Order: 11/04/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/04/2019 | $6,929.00 | 08/06/2018 | Other | |
Penalty | C: Contested | 08/28/2018 | $6,929.00 | 08/06/2018 | Serious | |
Penalty | Z: Issued | 07/31/2018 | $6,929.00 | 08/06/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.269(d)(6)(vi): When there was a possibility of reaccumulation of stored energy to a hazardous level, verification of isolation shall be continued until the servicing or maintenance is completed or until the possibility of such accumulation no longer exists: (a) On or about 3/16/2018 - Cooling Tower Lift Pump Station 6.9 KV Cooling Tower Board B Compartment 2, the employer adversely affected the protective grounds associated with HO 0-202-0594 when he disconnected and re-connected ground truck cable phases for continuity checks and allowed for the possibility of 6.9 KV energy re-accumulation hazards.