Violation Detail
Standard Cited: 19100219 M01 I Mechanical power-transmission apparatus.
Inspection Nr: 1305257.015
Citation: 01004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $7,853.00
Current Penalty: $5,000.00
Issuance Date: 07/10/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/03/2018
Gravity:
Report ID: 0213900
Contest Date: 08/06/2018
Final Order: 09/09/2019
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 09/09/2019 | $5,000.00 | 08/03/2018 | Other | |
Penalty | C: Contested | 08/07/2018 | $7,853.00 | 08/03/2018 | Serious | |
Penalty | Z: Issued | 07/10/2018 | $7,853.00 | 08/03/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.219(m)(1)(i): Expanded metal, perforated or solid sheet metal, wire mesh on a fame of angle iron, or iron pipe securely fastened to floor or frame of machine was not utilized for guarding. (a) Facility, Warehouse, Mezzanine Level, 300 Induction Line: The guarding used to cover the chain and sprocket was not constructed of substantial material, the guards were constructed of plastic material, on or about 3/29/2018 NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM, FAILURE TO DO SO WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 AS PER 29 CFR 1903.19