Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1303413.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $9,239.00
Current Penalty: $7,000.00
Issuance Date: 06/29/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 08/15/2018
Related Event Code (REC): R
Emphasis:
Substance: 0686
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/15/2018 | $7,000.00 | Serious | ||
Penalty | Z: Issued | 06/29/2018 | $9,239.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: PLATING LINE: On or about and at times prior to March 21, 2018, by not turning off the rectifier before trying to separate two racks of plumbing parts that were above Tank 15 (Chrome Plate) in the Plater #2 Plating Line, the company operating procedures were not followed. In addition, the procedure was inadequate in that the rectifier was not required to be locked out prior to attempting to separate the racks.