Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1299619.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,174.00
Current Penalty: $5,174.00
Issuance Date: 08/24/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/18/2018
Gravity: 10
Report ID: 0626000
Contest Date:
Final Order: 09/19/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 08/24/2018 | $5,174.00 | 09/18/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(d): 29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedures) covered the following elements, however, the actions were not done in sequence as required by 29 CFR 1910.147 (d)(1)-(6): On February 28, 2018, and times prior thereto, at the Molding Work Area in Production, employees enter the central cavity of the Thermo Former Machine for the installation of molding trays, without prior isolation of the energy sources.