Violation Detail
Standard Cited: 19100184 E03 II Slings.
Inspection Nr: 1298046.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,054.00
Current Penalty: $5,885.10
Issuance Date: 05/30/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/25/2018
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 06/20/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/20/2018 | $5,885.10 | 06/25/2018 | Serious | |
Penalty | Z: Issued | 05/30/2018 | $9,054.00 | 06/25/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.184(e)(3)(ii): Records of the most recent month in which each alloy steel chain sling was thoroughly inspected were not available for examination: On or about 2/28/2018, in the production lower area at 150 Dundee Drive, Milledgeville, GA: Alloy steel chain sling used by the two (2) employees to lift concrete blocks at weight up to 5000 pounds, the employer failed to provide records of the most recent month inspection.