Violation Detail
Standard Cited: 19100269 D02 V A Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1285745.015
Citation: 01004
Citation Type: Serious
Abatement Date: 07/17/2018
Initial Penalty: $7,391.00
Current Penalty: $0.00
Issuance Date: 04/17/2018
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 5
Report ID: 0112600
Contest Date: 05/15/2018
Final Order: 09/16/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/16/2019 | $0.00 | 07/17/2018 | Serious | |
Penalty | C: Contested | 05/16/2018 | $7,391.00 | 07/17/2018 | Serious | |
Penalty | Z: Issued | 04/17/2018 | $7,391.00 | 07/17/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.269(d)(2)(v)(A): The employer did not complete periodic inspections, at least annually, by authorized employees who were not using the energy control procedures being inspected. Tesla, Inc., 24 St. Martin Dr., Marlborough, Massachusetts; On or about December 29, 2017, the employer did not complete periodic inspections of the energy control procedures at least annually, by authorized personnel, to determine if there were any deficiencies in the procedures.