Violation Detail
Standard Cited: 19100269 D06 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1279886.015
Citation: 01004
Citation Type: Serious
Abatement Date: 08/01/2018 2
Initial Penalty: $9,054.00
Current Penalty: $9,054.00
Issuance Date: 05/21/2018
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 06/15/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/15/2018 | $9,054.00 | 08/01/2018 | Serious | |
Penalty | Z: Issued | 05/21/2018 | $9,054.00 | 05/25/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.269(d)(6)(iii): All energy isolating devices that are needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from energy sources: A. Process Fuel Belt Conveyor - Employees performing daily end of shift cleaning operations which require them to place their arms inside of the equipment would shut the equipment down by pushing a "stop" button and were not using locks to prevent the equipment from being restarted.