Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1267353.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $8,315.00
Current Penalty: $5,820.50
Issuance Date: 03/20/2018
Nr Instances: 3
Nr Exposed: 10
Abatement Date:
Gravity: 5
Report ID: 0214500
Contest Date: 04/12/2018
Final Order: 10/17/2019
Related Event Code (REC): C;I
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/17/2019 | $5,820.50 | Serious | ||
Penalty | C: Contested | 06/13/2018 | $8,315.00 | Serious | ||
Penalty | Z: Issued | 03/20/2018 | $8,315.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed: a) Repack Area Exit: The Exit Door was blocked by a pallet of merchandise, on or about 10/2/17 b) West Wall Warehouse 1: Aisles were blocked with pallets of boxes along the North Wall resulting in less than 10 inches of clearance, on or about 10/2/17 c) Glass Door Main Lobby: The swing of the Exit Door was limited to 24" by the floor carpet, on or about 10/4/17