Standard Cited: 19100107 I08 Spray finishing using flammable and combustible materials.
Inspection Nr: 1262357.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,315.00
Current Penalty: $4,157.00
Issuance Date: 02/06/2018
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 03/09/2018
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 03/06/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/06/2018 | $4,157.00 | 03/09/2018 | Serious | |
| Penalty | Z: Issued | 02/06/2018 | $8,315.00 | 03/09/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.107(i)(8): The electrical equipment was not so interlocked with the ventilation of the spraying area that the equipment could not be operated unless the ventilation fans were in operation. a. Lewco, Inc. located in Sandusky, Ohio: On or about September 8, 2017, the employer did not ensure the powder coating equipment and the ventilation systems were interlocked on the spray to waste booths located in the powder coating department.