Violation Detail
Standard Cited: 19260451 G04 I General requirements.
Inspection Nr: 1244918.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,408.00
Current Penalty: $6,844.00
Issuance Date: 12/07/2017
Nr Instances: 2
Nr Exposed: 1
Abatement Date: 01/04/2018
Gravity: 10
Report ID: 0316300
Contest Date:
Final Order: 12/20/2017
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/20/2017 | $6,844.00 | 01/04/2018 | Serious | |
| Penalty | Z: Issued | 12/07/2017 | $11,408.00 | 01/04/2018 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: (a) Date of Violation: On or about 07-06-2017 and times prior thereto, located at NAS Oceana - Dam Neck Annex 352 Bullpup Street. Virginia Beach, VA 23461: Instance #1: Employee(s) were exposed to open sides where guardrail systems were not installed along the 90 degree turns around the corners of the structure. Approximate height to ground below was 15 feet. Instance #2: Employee(s) were exposed to an inadequate guarded side of the extended work platform where there was not an adequate guard rail system nor was personal fall protection used. A platform extended side-bracket was placed at the end to act as a guardrail system. Approximate height to ground below was 19 feet. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.