Violation Detail
Standard Cited: 19100119 E01 Process safety management of highly hazardous chemicals.
Inspection Nr: 1207858.015
Citation: 01004
Citation Type: Serious
Abatement Date: 06/12/2017 2
Initial Penalty: $8,873.00
Current Penalty: $4,436.50
Issuance Date: 05/16/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 10
Report ID: 0729700
Contest Date:
Final Order: 06/09/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/09/2017 | $4,436.50 | 06/12/2017 | Serious | |
Penalty | Z: Issued | 05/16/2017 | $8,873.00 | 06/12/2017 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.119(e)(1): The employer did not perform an initial process hazard analysis (hazard evaluation) on processes covered by 29 CFR 1910.119: The employer is failing to protect employees from explosion hazards while engaged in chemical mixing activities. This was most recently documented on or about February 7, 2017 at the Airosol Company, Inc., located at 1206 Illinois Street in Neodesha, Kansas. The company failed to perform an initial process hazard analysis to identify, evaluate, and control the hazards of flammable process chemical involved in the process. 29 CFR 1903.19(d)(1) requires certification and documentation that the abatement of the above violation is completed.