Violation Detail
Standard Cited: 19100022 B General requirements.
Inspection Nr: 1207843.015
Citation: 01004
Citation Type: Serious
Abatement Date: 02/02/2018 2
Initial Penalty: $6,338.00
Current Penalty: $3,042.00
Issuance Date: 06/26/2017
Nr Instances: 2
Nr Exposed: 16
Related Event Code (REC):
Gravity: 5
Report ID: 0215800
Contest Date: 07/09/2017
Final Order: 02/02/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/02/2018 | $3,042.00 | 02/02/2018 | Serious | |
Penalty | C: Contested | 07/26/2017 | $6,338.00 | 07/07/2017 | Serious | |
Penalty | Z: Issued | 06/26/2017 | $6,338.00 | 07/07/2017 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.22(b): The employer did not ensure that each walking-working surface can support the maximum intended load for that surface: a) On or about 1/27/2017: Storage Mezzanine: Pallets of bagged material exerting a pressure on the storage room floor of 80 pounds per square foot, were stored in an area rated for 75 pounds per square foot. b) On or about 2/16/2017: Stock prep area: The concrete floor in front of the Beater room office was failing in that there were long longitudinal cracking on the underside of the floor, seepage, top side cracking, along with noticeable deflection as loaded fork trucks traveled over the floor section. Abatement certification must be submitted for these items.