Violation Detail
Standard Cited: 19100252 A03 II General requirements.
This violation item has been deleted.
Inspection Nr: 1195690.015
Citation: 01004
Citation Type: Serious
Abatement Date: 04/19/2017
Initial Penalty: $12,675.00
Current Penalty: $0.00
Issuance Date: 03/22/2017
Nr Instances: 45
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0523300
Contest Date: 04/03/2017
Final Order: 02/04/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/04/2019 | $0.00 | 04/19/2017 | Serious | |
Penalty | C: Contested | 04/04/2017 | $12,675.00 | 04/19/2017 | Serious | |
Penalty | Z: Issued | 03/22/2017 | $12,675.00 | 04/19/2017 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.252(a)(3)(ii): All hollow spaces, cavities, or containers were not vented to permit the escape of air or gases before preheating, cutting, or welding was performed: On or about December 07, 2016 employees did not ventilate empty used transformers before plasma cutting the transformer tops off.