Violation Detail
Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.
Inspection Nr: 1179074.015
Citation: 01004
Citation Type: Serious
Abatement Date: 11/03/2017 2
Initial Penalty: $11,408.00
Current Penalty: $7,200.00
Issuance Date: 03/22/2017
Nr Instances: 2
Nr Exposed: 11
Related Event Code (REC):
Gravity: 10
Report ID: 0214200
Contest Date:
Final Order: 04/12/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/12/2017 | $7,200.00 | 11/03/2017 | Serious | |
Penalty | Z: Issued | 03/22/2017 | $11,408.00 | 05/03/2017 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (as defined by the process safety information in 29 CFR 119(d)) before further use or in a safe and timely manner: a) Chlorine Process The employer failed to correct recommendations identified in the 2015 TAI Report for Chlorine System Piping & Vessels to include but are not limited to paint failures observed in ISO-1001-10 East KO Pot, ISO-1002-00 KO pots and associated piping, ISO 1002-11 paint failure along complete lines, ISO-1001-12 coating failure upper half of vessel, ISO-1001-11 vessel paint failure with surface rust. Violation occurred on or about 09/22/2016 - 03/06/2017.