Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 11754140
Citation: 01004
Citation Type: Other
Abatement Status: X
Initial Penalty: $35.00
Current Penalty: $35.00
Issuance Date: 03/19/1976
Nr Instances: 1
Nr Exposed:
Abatement Date: 04/05/1976
Gravity:
Report ID: 0215000
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate