Violation Detail
Standard Cited: 19260062 D01 III Lead
Inspection Nr: 1169831.015
Citation: 01004
Citation Type: Serious
Abatement Date: 02/23/2017 2
Initial Penalty: $6,338.00
Current Penalty: $3,802.80
Issuance Date: 01/31/2017
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 5
Report ID: 0627700
Contest Date:
Final Order: 03/22/2017
Emphasis:
Substance: 1591
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/22/2017 | $3,802.80 | 02/23/2017 | Serious | |
Penalty | Z: Issued | 01/31/2017 | $6,338.00 | 02/23/2017 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.62(d)(1)(iii): The employer did not collect personal samples representative of a full shift, including at least one sample for each job classification in each work area, either for each shift or for the shift with the highest exposure level: a. On or about August 4, 2016 and at times prior to, at the power plant, the employer did not collect personal samples to determine employee lead exposure during tasks which include, but are not limited to manual scraping and chemical stripping of metal parts of turbines and generators where lead-containing coating is present.