Violation Detail
Standard Cited: 19260850 J Preparatory operations.
Inspection Nr: 1147045.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,224.00
Current Penalty: $7,028.00
Issuance Date: 10/12/2016
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 10/24/2016
Gravity: 10
Report ID: 0215000
Contest Date: 06/26/2017
Final Order: 01/03/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/03/2018 | $7,028.00 | 10/24/2016 | Serious | |
Penalty | C: Contested | 06/26/2017 | $11,224.00 | 10/24/2016 | Serious | |
Penalty | Z: Issued | 10/12/2016 | $11,224.00 | 10/24/2016 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.850(j): The demolition of exterior walls and floor construction did not begin at the top of the structure and proceed downward. Each story of exterior wall and floor construction was not removed and dropped into the storage space before commencing the removal of exterior walls and floors in the story next below. a) Jobsite, 2-story building: Employees utilized excavators with shear attachments to mechanically demolish a building from the sides. The roof, 2nd, and 1st stories are demolished simultaneously. The demolition of exterior walls and floor construction did not begin at the top of the structure and proceed downward. On or about 04/18/16.