Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1113374.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,300.00
Current Penalty: $3,780.00
Issuance Date: 04/25/2016
Nr Instances: 1
Nr Exposed: 25
Abatement Date: 05/18/2016
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 05/10/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/10/2016 | $3,780.00 | 05/18/2016 | Serious | |
Penalty | Z: Issued | 04/25/2016 | $6,300.00 | 05/18/2016 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: a.) Edge Plastics, Inc. located at 449 Newman St. Mansfield, OH 44902; On or about December 18, 2015, the employer did not assure periodic audits of the energy control procedure was completed at least annually. Employees are required to perform servicing and maintenance activities on machines including but not limited to, injection molding presses, which require energy control procedures that have not been reviewed for deficiencies.