Violation Detail
Standard Cited: 19100147 C07 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1095766.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,700.00
Current Penalty: $1,900.00
Issuance Date: 03/23/2016
Nr Instances: 1
Nr Exposed: 25
Abatement Date: 05/09/2016
Gravity: 1
Report ID: 0418100
Contest Date:
Final Order: 04/18/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/18/2016 | $1,900.00 | 05/09/2016 | Serious | |
Penalty | Z: Issued | 03/23/2016 | $2,700.00 | 05/09/2016 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(7)(i)(B): Affected employees were not instructed in the purpose and use of the energy control procedure. On 10/1/15, at the Athens facility, the employer did not instruct each Affected employee in the purpose and use of the company's energy control procedure.