Violation Detail
Standard Cited: 19260453 B02 I Aerial lifts.
Inspection Nr: 1095613.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 03/18/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 04/06/2016
Gravity: 10
Report ID: 0419700
Contest Date:
Final Order: 04/13/2016
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/13/2016 | $7,000.00 | 04/06/2016 | Serious | |
Penalty | Z: Issued | 03/18/2016 | $7,000.00 | 04/06/2016 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.453(b)(2)(i): Lift controls shall be tested each day prior to use to determine that such controls are in safe working condition. a). On or about October 1, 2015, employees operating JLG 450AJ Aerial Lift were not required to operational test lift controls each day prior to use to determine that the controls were in safe working condition, exposing employees to crushing hazards.