Violation Detail
Standard Cited: 19260850 D Preparatory operations.
This violation item has been deleted.
Inspection Nr: 1091398.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 01/15/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/09/2016
Gravity: 10
Report ID: 0419400
Contest Date: 02/01/2016
Final Order: 05/05/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 05/05/2017 | $0.00 | 02/09/2016 | Serious | |
| Penalty | C: Contested | 04/05/2016 | $7,000.00 | 02/09/2016 | Serious | |
| Penalty | Z: Issued | 01/15/2016 | $7,000.00 | 02/09/2016 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.850(d): Electrical power, water or other utility lines required to remain available during demolition were not temporarily relocated and protected, as necessary. (a) Jobsite - On or about September 14, 2015 electrical power to the special purpose personnel elevator was not temporarily relocated, as necessary, and protected during demolition work.
Translate