Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1085441.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 02/09/2016
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 03/28/2016
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order: 03/03/2016
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 02/09/2016 | $7,000.00 | 03/28/2016 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) The employer did not ensure that a periodic inspection of the hazardous energy control procedures was conducted on equipment such as, but not limited to, the Milnor dryer and Pellerin Milnor conveyor.