Violation Detail
Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.
Inspection Nr: 1082421.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,900.00
Current Penalty: $3,000.00
Issuance Date: 02/04/2016
Nr Instances: 2
Nr Exposed: 45
Abatement Date:
Gravity: 10
Report ID: 0214200
Contest Date:
Final Order: 02/25/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/25/2016 | $3,000.00 | Serious | ||
Penalty | Z: Issued | 02/04/2016 | $4,900.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complies with recognized and generally accepted good engineering practices (RAGAGEP). a) Tank T-153 Intervening/Stop Valve 153-HV-002 The employer did not comply with RAGAGEP such as, but not limited to, ASME Boiler and Pressure Vessel Code, Section VIII, UG-135(d) when it failed to provide adequate controls to ensure that an intervening stop valve (Isolation Valve 153-HV-002 on ethyl chloride tank T-153) upstream from pressure relief devices remained in the open position during pressure vessel operation. Violation occurred on or about 8/4/15. b) Weigh tank Intervening/Stop valve WT-HV-SV The employer did not comply with RAGAGEP such as, but not limited to, ASME Boiler and Pressure Vessel Code, Section VIII, UG-135(d) when it failed to provide adequate controls to ensure that an intervening stop valve (Isolation Valve WT-HV-SV on ethyl chloride weigh tank WT-100) upstream from pressure relief devices remained in the open position during pressure vessel operation. Violation occurred on or about 8/4/15.