Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 10680361
Citation: 01004
Citation Type: Other
Abatement Status: X
Initial Penalty: $30.00
Current Penalty: $30.00
Issuance Date: 05/19/1975
Nr Instances: 2
Nr Exposed:
Abatement Date: 06/09/1975
Gravity:
Report ID: 0112600
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate