Violation Detail
Standard Cited: 19260855 F Manual removal of floors.
Inspection Nr: 1052579.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,900.00
Issuance Date: 05/27/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/16/2015
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 06/15/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/15/2015 | $4,900.00 | 06/16/2015 | Serious | |
Penalty | Z: Issued | 05/27/2015 | $7,000.00 | 06/16/2015 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.855(f): When floor arches are being removed, employees shall not be allowed in the area directly underneath, and such an area shall be barricaded to prevent access to it. a. While floor arches from the mezzanine were being removed the employer failed to block of the area below to ensure the safety of employees, thereby exposing them to a struck by/caught under hazard.