Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1047617.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $6,300.00
Current Penalty: $3,150.00
Issuance Date: 06/18/2015
Nr Instances: 2
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0522300
Contest Date: 07/09/2015
Final Order: 11/16/2015
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/16/2015 | $3,150.00 | Serious | ||
Penalty | C: Contested | 07/13/2015 | $6,300.00 | Serious | ||
Penalty | Z: Issued | 06/18/2015 | $6,300.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: On or about March 19, 2015, the employer failed to ensure employees operating both of the Mazak CNC machines were protected against contact with the rotating spindle by having an operational interlock or other form of machine guarding in place.