Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.

This violation item has been deleted.

Inspection Nr: 1019650.015

Citation: 01004

Citation Type: Serious

Abatement Status:  

Initial Penalty: $7,000.00

Current Penalty: $0.00

Issuance Date: 07/09/2015

Nr Instances: 1

Nr Exposed: 33

Abatement Date: 08/25/2015

Gravity: 10

Report ID: 0626700

Contest Date: 07/30/2015

Final Order: 06/05/2017

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 06/05/2017 $0.00 08/25/2015 Serious  
Penalty C: Contested 07/30/2015 $7,000.00 08/25/2015 Serious  
Penalty Z: Issued 07/09/2015 $7,000.00 08/25/2015 Serious  

Text For Citation: 01 Item/Group: 004 Hazard:

29 CFR 1910.119(j)(2): Written procedures. The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment. On or about January 12, 2015 in the Hydrogen Fluoride Unit (HF) at DuPont Plant located in La Porte, the employer did not establish and implement written procedures to maintain the on-going integrity of process equipment such as lined process piping (e.g. Teflon-lined piping).

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close