Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1018002.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $1,200.00
Current Penalty: $840.00
Issuance Date: 01/20/2015
Nr Instances: 1
Nr Exposed: 12
Abatement Date: 02/13/2015
Gravity: 1
Report ID: 0729700
Contest Date:
Final Order: 02/09/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/09/2015 | $840.00 | 02/13/2015 | Serious | |
| Penalty | Z: Issued | 01/20/2015 | $1,200.00 | 02/13/2015 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors: Employees engaged in production activities on the kill floor were exposed to fire hazards in that the flexible cord supplying power to the overhead hoist ran through the ceiling.
Translate