Violation Detail
Standard Cited: 19100303 B07 IV General.
Inspection Nr: 1011722.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,600.00
Current Penalty: $3,600.00
Issuance Date: 03/31/2015
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 05/19/2015
Gravity: 5
Report ID: 0111400
Contest Date:
Final Order: 04/27/2015
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/31/2015 | $3,600.00 | 05/19/2015 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.303(b)(7)(iv): Electrical equipment was not installed in a neat and workmanlike manner. There were damaged parts that could adversely affect safe operation or mechanical strength of the equipment, such as parts that were broken, bent, cut, or deteriorated by corrosion, chemical action, or overheating: 1) Battery charger: A metal conduit and electrical outlet was broken away from a junction box. 2) Loading dock: There were two burnt outlets.