Violation Detail
Standard Cited: 19100179 N04 I Overhead and gantry cranes.
Inspection Nr: 1797905.015
Citation: 01003E
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/04/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/16/2025
Gravity: 5
Report ID: 0830600
Contest Date: 04/29/2025
Final Order: 07/18/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/18/2025 | $0.00 | 06/16/2025 | Other | |
Penalty | C: Contested | 04/30/2025 | $0.00 | 05/02/2025 | Serious | |
Penalty | Z: Issued | 04/04/2025 | $0.00 | 05/02/2025 | Serious |
Text For Citation: 01 Item/Group: 003E Hazard:
29 CFR 1910.179(n)(4)(i):The upper limit switch of each hoist was not tried out under no load, at the beginning of each operator's shift. a) On or about October 23, 2024, and at times prior, the employer did not ensure that the upper limit switch of each hoist, the Demac and Detroit hoists located on the overhead bridge cranes on the east and west side of the shop, were tried out under no load at the beginning of each operator's shift.