Violation Detail
Standard Cited: 19100179 L03 III Overhead and gantry cranes.
Inspection Nr: 1797905.015
Citation: 01003D
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/04/2025
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 06/16/2025
Gravity: 5
Report ID: 0830600
Contest Date: 04/29/2025
Final Order: 07/18/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/18/2025 | $0.00 | 06/16/2025 | Other | |
Penalty | C: Contested | 04/30/2025 | $0.00 | 05/02/2025 | Serious | |
Penalty | Z: Issued | 04/04/2025 | $0.00 | 05/02/2025 | Serious |
Text For Citation: 01 Item/Group: 003D Hazard:
29 CFR 1910.179(l)(3)(iii): Repairs or replacements were not provided promptly as needed for safe operation of crane(s): a) On or about October 23, 2024, and at times prior, the employer did not ensure that repairs to the overhead bridge crane on the west side such as broken latches on the hook, the pin coming out of the hoist, and no rated load for the crane marked, were promptly conducted for safe operation of the crane b) On or about October 23, 2024, and at times prior, the employer did not ensure that repairs to the overhead bridge crane on the east side such as broken latches on the hook and no rated load for the crane marked, were promptly conducted for safe operation of the crane.