Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1741389.015
Citation: 01003C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,913.00
Current Penalty: $0.00
Issuance Date: 05/20/2024
Nr Instances: 4
Nr Exposed: 50
Abatement Date: 07/09/2024
Gravity: 1
Report ID: 0111100
Contest Date:
Final Order: 06/13/2024
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/13/2024 | $0.00 | 07/09/2024 | Serious | |
| Penalty | Z: Issued | 05/20/2024 | $6,913.00 | 07/09/2024 | Serious |
Text For Citation: 01 Item/Group: 003C Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: Basement - The employer used two flexible extension cords as permanent wiring in the basement.
Translate