Violation Detail
Standard Cited: 19100157 E03 Portable fire extinguishers.
Inspection Nr: 1734118.015
Citation: 01003C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/10/2024
Nr Instances: 3
Nr Exposed: 10
Abatement Date: 09/30/2024
Gravity: 5
Report ID: 0316100
Contest Date:
Final Order: 10/15/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/10/2024 | $0.00 | 09/30/2024 | Serious |
Text For Citation: 01 Item/Group: 003C Hazard:
29 CFR 1910.157(e)(3): Portable fire extinguishers were not subjected to an annual maintenance check: Gallaudet University Central Plant, 800 Florida Ave., NE, Washington, DC 20002: (a) Boiler 3 - On or about May 15, 2024, an ABC Fire Extinguisher had not been inspected since April 2023. (b) Front Chiller Room Entry Door - On or about May 15, 2024, an ABC Fire Extinguisher had not been inspected since April 2023. (c) Across from High Pressure Area - On or about May 15, 2024, an ABC Fire Extinguisher had not been inspected since April 2023. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.