Violation Detail
Standard Cited: 19100119 I02 III Process safety management of highly hazardous chemicals.
Inspection Nr: 1710650.015
Citation: 01003C
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/10/2024
Nr Instances: 1
Nr Exposed: 1400
Abatement Date: 09/30/2025
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 06/05/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 07/17/2025 | $0.00 | 09/30/2025 | Serious | |
Penalty | P: Petition to Mod Abatement | 03/14/2025 | $0.00 | 06/30/2025 | Serious | |
Penalty | P: Petition to Mod Abatement | 08/30/2024 | $0.00 | 07/01/2025 | Serious | |
Penalty | I: Informal Settlement | 06/05/2024 | $0.00 | 07/01/2025 | Serious | |
Penalty | Z: Issued | 05/10/2024 | $0.00 | 06/14/2024 | Serious |
Text For Citation: 01 Item/Group: 003C Hazard:
29 CFR 1910.119(i)(2): The pre-startup safety review did not confirm that prior to the introduction of highly hazardous chemicals to a process: 29 CFR 1910.119(i)(2)(iii):For new facilities, a process hazard analysis has been performed and recommendations have been resolved or implemented before startup; and modified facilities meet the requirements contained in management of change, paragraph (l): On or about and prior to November 15, 2023, the employer failed to ensure that a process hazard analysis (PHA) had been performed on the Central Electrolyte Storage System (CESS) and packaging line covered processes and that all PHA team recommendations have been resolved prior to startup of the process. A PHA was not performed prior startup of the covered process for the new facility.