Standard Cited: 19100119 J06 II Process safety management of highly hazardous chemicals.
Inspection Nr: 1652377.015
Citation: 01003C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,685.00
Current Penalty: $0.00
Issuance Date: 06/20/2023
Nr Instances: 2
Nr Exposed: 18
Abatement Date: 07/24/2023
Gravity: 5
Report ID: 0213900
Contest Date:
Final Order: 07/06/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/06/2023 | $0.00 | 07/24/2023 | Serious | |
Penalty | Z: Issued | 06/20/2023 | $7,685.00 | 07/24/2023 | Serious |
Text For Citation: 01 Item/Group: 003C Hazard:
29 CFR 1910.119(j)(6)(ii):Appropriate checks and inspections shall be performed to assure that equipment is installed properly and consistent with design specifications and the manufacturer's instructions. (a) Building 1, trains 6/7 (Ethanothebaine crude wet process), vessel T-1021: On or about 12/21/22, the tubular flow sight glass on the bottom 2" liquid transfer line was not installed with an isolation valve located between the vessel and the sight glass as indicated on P&ID 01-35. (b) Building 1, trains 6/7 (Ethanothebaine crude wet process), vessel H-1024: On or about 12/21/22, the bullseye sight glass on the bottom 2" liquid transfer line was not installed with an isolation valve located between the vessel and the sight glass as indicated on P&ID 01-14.