Violation Detail
Standard Cited: 19100184 E03 I Slings.
Inspection Nr: 1531803.015
Citation: 01003C
Citation Type: Serious
Abatement Date: 11/01/2021 2
Initial Penalty: $2,341.00
Current Penalty: $0.00
Issuance Date: 09/09/2021
Nr Instances: 10
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 10/04/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/04/2021 | $0.00 | 11/01/2021 | Serious | |
Penalty | Z: Issued | 09/09/2021 | $2,341.00 | 10/07/2021 | Serious |
Text For Citation: 01 Item/Group: 003C Hazard:
29 CFR 1910.184(e)(3)(i): In addition to the inspection required by paragraph (d) of this section, a thorough periodic inspection of alloy steel chain slings in use shall be made on a regular basis, to be determined on the basis of (A) frequency of sling use; (B) severity of service conditions; (C) nature of lifts being made; and (D) experience gained on the service life of slings used in similar circumstances. Such inspections shall in no event be at intervals greater than once every 12 months. Inspection of the slings used in the facility were not conducted on a periodic basis, no greater than every 12 months, to ensure worn slings and attachments or those with damage such as cracks, kinks, bends, cuts, gouges, and frayed fibers were removed from service.