Violation Detail
Standard Cited: 19100269 M03 II Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1507500.015
Citation: 01003C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/28/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/24/2021
Gravity: 10
Report ID: 0626300
Contest Date: 06/25/2021
Final Order: 04/01/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 04/01/2022 | $0.00 | 06/24/2021 | Serious | |
| Penalty | C: Contested | 07/09/2021 | $0.00 | 06/24/2021 | Serious | |
| Penalty | Z: Issued | 05/28/2021 | $0.00 | 06/24/2021 | Serious |
Text For Citation: 01 Item/Group: 003C Hazard:
29 CFR 1910.269(m)(3)(ii): The employer did not ensure that all switches, disconnectors, jumpers, taps, and other means through which known sources of electric energy might be supplied to the particular lines and equipment were de-energized/open and then did not ensure that such means were tagged to indicate that employees were at work: (a) On or about December 19, 2020, an employee working and inspecting electrical equipment was exposed to an electrical hazard when the known sources of electric energy that might be supplied to the equipment were not de-energized/open and tagged to indicate employees were at work.