Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 990492.015
Citation: 01003B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/12/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 02/17/2015
Gravity: 10
Report ID: 0213900
Contest Date: 03/11/2015
Final Order: 04/11/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 04/11/2016 | $0.00 | 02/17/2015 | Serious | |
| Penalty | C: Contested | 03/11/2015 | $0.00 | 02/17/2015 | Serious | |
| Penalty | Z: Issued | 02/12/2015 | $0.00 | 02/17/2015 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) New York Avenue Apartments, 233 North New York Avenue, Atlantic City, NJ 08401: On or about August 15, 2014 the employer did not establish energy control procedures for employees performing maintenance and repairs on elevators. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.